What are the necessary preparation steps for hydraulic shearing machine?
Still worried about inefficient shearing? Inadequate preparation often leads to equipment damage and operational errors, directly impacting your work performance. Mastering the following essential preparation steps for your hydraulic shear will ensure smoother operation and more precise cutting.

Preparing a hydraulic shear is crucial: checking blade alignment, confirming the hydraulic oil level, and calibrating the machine to the material being processed are essential. Proper preparation not only ensures cutting accuracy, increases productivity, and extends the life of the machine, but also provides the foundation for maintaining optimal performance and avoiding costly downtime.
Next, we will analyze each preparation step in detail to help you fully master the operation essentials.
To ensure the safety and efficiency of your hydraulic shears, you must prepare them properly before starting. This article will introduce the core preparation steps that will help you avoid problems and improve cut quality. These steps are essential for both daily use and regular maintenance. Next, we'll explain how to prepare your equipment for optimal performance, saving you time and effort.

For some new customers who are operating the HARSLE hydraulic shearing machine for the first time, when they receive the metal shearing machine at the factory, they may be a little confused about how to start the hydraulic shearing machine. Today, we will share with you some tips on how to operate the machine correctly.

Hydraulic shearing machine preparation steps
Fill the oil tank.
Use No. 46 hydraulic oil and ensure the oil level meets the required standards.
Connect the power supply.
Properly connect the cables between the hydraulic shear and the power supply.
Install the foot switch.
Securely connect the foot switch to the shear to ensure safe operation.
Release the emergency stop button.
Release the emergency stop button to prepare the machine for operation.
Start the pump and quickly stop it.
Start the pump and then immediately press the stop button to verify function.
Check the direction of motor rotation.
Observe the direction of rotation of the main motor:
Clockwise: Connection is correct.
Counterclockwise: Adjust the connection until the direction is clockwise.
Start and test run.
After all checks are completed, start the machine and perform a test run to ensure normal operation.
With these steps in mind, you can confidently prepare your hydraulic shear for operation. Learn more about each step to ensure your machine is running optimally!